日本在线一区二区三区欧美,国产一区亚洲,国内精品久久久久久2021,一级毛片免费在线,caoprn在线视频免费播放,亚洲欧美日本韩国,午夜免费福利片观看

CN EN

NEWS

The role of power transformers

Power transformers are one of the main equipment for power plants and substations. The role of the transformer is not only to increase the voltage to send electricity to the electricity area, but also to reduce the voltage to the voltage used at each level to meet the needs of electricity. In short, both boost and buck must be done by a transformer. In the process of transmitting electrical energy in the power system, voltage and power losses are inevitably generated. When the same power is delivered, the voltage loss is inversely proportional to the voltage, and the power loss is inversely proportional to the square of the voltage. Using a transformer to increase the voltage reduces the loss of power transmission.
Transformer is composed of two or more coil windings wound on the same core, the windings are connected by alternating magnetic field and work according to the principle of electromagnetic induction. The installation location of the transformer should be considered for easy operation, maintenance and transportation, and a safe and reliable place should be chosen. The rated capacity of the transformer must be reasonably selected when using the transformer. When the transformer is running at no load, a large amount of reactive power is required. These reactive powers are supplied by the power supply system. If the capacity of the transformer is too large, it not only increases the initial investment, but also makes the transformer run at no load or light load for a long time, which increases the proportion of no-load loss, reduces the power factor, and increases the network loss. This operation is neither economical nor reasonable. If the transformer capacity selection is too small, the transformer will be overloaded for a long time and the equipment will be damaged. Therefore, the rated capacity of the transformer should be selected according to the needs of the electrical load, and should not be too large or too small.
2019/06/03 13:48:46 4167 次

Related Documents

Contact:Mr. YuanTel:+86-510-87846969 Fax:+86-510-87848616
E-mail:yxwb@vip.163.comAdd:Wanshi Town Industrial Concentration Zone, Yixing City, Jiangsu
Copy right ? 2019 Yixing Wansheng Transformer Co., Ltd.